BIM技术下IPD项目团队激励池分配研究
发布时间:2018-08-24 11:43
【摘要】:基于BIM技术的信息共享平台支持下,提出激励池概念,确定激励池最优规模。采用社会网络分析法(SNA),熵值法对IPD项目各参与方的风险感知因素和贡献值进行定量分析,构建激励池分配模型,量化各参与方以何种比例来分配激励池中的共享收益,提供激励池分配的合理决策方案,以期推进IPD模式在我国的实施。
[Abstract]:Under the support of information sharing platform based on BIM technology, the concept of incentive pool is put forward, and the optimal scale of incentive pool is determined. The (SNA), entropy method of social network analysis is used to quantitatively analyze the risk perception factors and contribution value of each participant in IPD project, to construct the incentive pool allocation model, and to quantify the proportion of each participant to distribute the shared income in the incentive pool. The rational decision-making scheme of incentive pool allocation is provided in order to promote the implementation of IPD model in China.
【作者单位】: 西安建筑科技大学土木工程学院;
【基金】:国家自然科学基金项目“基于BIM的明清古建筑数字化保护与修复方法研究”(51278400)
【分类号】:F272.92
本文编号:2200723
[Abstract]:Under the support of information sharing platform based on BIM technology, the concept of incentive pool is put forward, and the optimal scale of incentive pool is determined. The (SNA), entropy method of social network analysis is used to quantitatively analyze the risk perception factors and contribution value of each participant in IPD project, to construct the incentive pool allocation model, and to quantify the proportion of each participant to distribute the shared income in the incentive pool. The rational decision-making scheme of incentive pool allocation is provided in order to promote the implementation of IPD model in China.
【作者单位】: 西安建筑科技大学土木工程学院;
【基金】:国家自然科学基金项目“基于BIM的明清古建筑数字化保护与修复方法研究”(51278400)
【分类号】:F272.92
【相似文献】
相关期刊论文 前2条
1 欧阳东;李克强;赵瑗琳;;BIM技术——第二次建筑设计革命[J];建筑技艺;2014年02期
2 ;[J];;年期
相关会议论文 前2条
1 李文西;;建筑工程设计中的BIM[A];2014年8月建筑科技与管理学术交流会论文集[C];2014年
2 蒲红克;魏庆朝;;BIM技术在地铁施工过程周边建筑加固中的应用[A];第十届建构筑物改造和病害处理学术研讨会、第五届工程质量学术会议论文集[C];2014年
,本文编号:2200723
本文链接:https://www.wllwen.com/jingjilunwen/xmjj/2200723.html