时间和质量管理在CH公司国情普查项目的应用研究
[Abstract]:CH is the largest surveying and mapping enterprise in Zhongshan. It has a national Grade A surveying and mapping qualification. It has won more than 30 national, provincial and municipal science and technology progress awards. The company has grown up to be Zhongshan's land and real estate management. Urban planning and urban construction have provided a large number of surveying and mapping achievements and services. Since 2010, the surveying and mapping geographic information industry has developed rapidly, the scale of surveying and mapping projects has become larger and larger, and the quality requirements have become higher and higher. But CH's project management tools have not been improved. The project management lacks scientific and reasonable plan, and the execution and adjustment is quite random. In the process of execution, it often appears first loose and then tight. In the later stage, the quality control is often ignored for the sake of project schedule, and some projects can not be completed according to the established goal. The contradiction between the whole project management system and the current situation. The time and quality management of the Ch company's national situation census project is a political task to be solved urgently. The national situation census results are regarded as the initial data of the geographical situation monitoring. The project has the characteristics of tight time, high quality and great technical difficulty. How to manage the time and quality of the project is an urgent problem to be solved. This paper starts with the present situation and existing problems of time management and quality management of the project, combining with the practical management experience, and with the help of the theory and method of modern project management, explores the management mode suitable for the project. In the aspect of time management, this paper combines theory and practice to decompose, sort, estimate, plan and control the activities of the project step by step. The management scientific analysis methods, such as (PERT), Gantt chart and critical path method, are adopted to carry out the work of each stage of the project. Some of the working procedures and plans in actual production are deviated, and the critical path time of the other stage is compressed through the adjustment of resources. Ensure the overall progress of the project. In terms of quality management, the author starts with quality planning, quality assurance and quality control, and adopts quality verification system PDCA cycle method and total quality management method. The quality consciousness of the whole staff is put forward to ensure that the quality of the national census project meets the planning requirements. This paper is an attempt to study the project theory of the national census project, hoping to have some reference significance and reference function for the similar surveying and mapping project in the future.
【学位授予单位】:电子科技大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:F49
【参考文献】
相关期刊论文 前10条
1 陈传河;;地理国情普查标准时点核准技术探讨[J];中国科技信息;2016年01期
2 吴玉忱;;测绘企业内部信息管理的内容及重要性[J];测绘与空间地理信息;2015年12期
3 付治河;;地理国情普查项目监理方法研究[J];测绘通报;2015年04期
4 杨伯钢;王淼;;北京市第一次地理国情普查方法浅谈[J];北京测绘;2015年01期
5 桂新;伍水华;;地理国情普查过程质量控制的内容与要求[J];江西测绘;2014年04期
6 史文博;;浅谈地理国情普查的技术流程[J];测绘与空间地理信息;2014年06期
7 刘德鑫;;浅谈测绘工程的质量管理与系统控制[J];黑龙江冶金;2012年04期
8 刘旭;;第二次全国土地调查土地利用现状数据缩编项目成果质量检查与评定的探讨[J];测绘与空间地理信息;2011年04期
9 李光明;;测绘工程的质量管理与系统控制探讨[J];煤炭技术;2011年02期
10 宁镇亚;;中、日、韩三国测绘法对测绘成果管理的规定[J];测绘与空间地理信息;2009年05期
相关硕士学位论文 前6条
1 卢德明;东莞市某公路测绘工程质量管理控制[D];华南理工大学;2014年
2 胥姝;SL机场测绘工程项目的进度与质量管理研究[D];电子科技大学;2014年
3 孔旭霞;时间管理在乌兹别克泵站改造项目中的应用研究[D];首都经济贸易大学;2014年
4 张利辉;AMS项目质量管理的应用研究[D];电子科技大学;2013年
5 孟凡英;XX工程施工质量控制研究[D];西南交通大学;2013年
6 邵怡;房地产项目质量管理的探索与实践[D];复旦大学;2008年
,本文编号:2226805
本文链接:https://www.wllwen.com/jingjilunwen/xxjj/2226805.html