公路建设项目水土保持方案编制研究
发布时间:2018-04-21 15:32
本文选题:公路建设 + 水土流失 ; 参考:《山西农业大学》2015年硕士论文
【摘要】:公路是连接各地区的基础,随着我国经济飞速发展,公路建设项目越来越来。公路的大量修建,伴随而来的是愈演愈烈的环境污染问题,其中水土流失问题尤为严重。公路建设施工过程会影响到土地和水资源,同时诱发地质灾害和灾害性天气的发生与形成,这不仅影响了生态环境,也对人民生命财产构成潜在的危险。合理的治理措施将会有效减缓水土流失的发生,因此编制切实可行的水土保持方案具有重大的现实意义。水保方案编制时,需考虑项目区的基本情况、土石方平衡、方案比选、水土流失防治责任范围与分区、水土流失量的预测、防治措施的布设、水土保持的监测、水土保持投资与效益分析等内容。编制方案时要以项目的基本情况作为基础,根据项目的地理位置来确定水土流失的侵蚀模数和防治标准。根据项目占地和工程性质来确定水土流失量和需要布设的措施、防治责任范围以及补偿费用。根据项目的组成来定土石方量、防治措施的工程量与投资量、并布设监测点位。要保证最大限度减小水土流失量,少占地、雨季不施工、布设合理防治措施是很有效的措施。水土保持方案编制过程,需要在重视基础资料的同时进行实地考察,重在结合实际,做到切实能为项目的建设提供理论依据与技术支持。本文以岢大线为实例对公路水土保持方案的编制进行了详细论述。岢大线位于位于山西省兴县境内,全长31.643km,投资154376.84万元,为沥青路面,共包括9座桥梁和一座隧道,建设期24个月。工程建设期需借土方24.92万m3;取土场占地8.49hm2,其中原有弃土场7处,新增5处,共14处;弃方总量273.69万m3,需开挖和回填各9.90万m3,共占地25.93hm2。方案比选表明,A线(起于兴县城东北的魏家滩镇,沿旧省道岢大线经瓦塘、蔡家崖接现有忻黑线连接,全长31.643km)扰动地表面积、损坏水保设施面积、水土流失量、工程投资方面均具有优势。A方案水土流失防治责任范围共284.37hm2,其中项目建设区238.11hm2,直接影响区46.26hm2。项目共分为路基工程区、桥梁工程区、隧道工程区、等共9个水土保持防治区。该公路扰动地表面积共238.69hm2,破坏水土保持设施面积309.58hm2,永久弃方273.69万m3;土壤侵蚀模数4600t/km2·a,预测施工期平均水土流失模数11000t/km2·a;该公路可能造成土壤流失总量82017.24t,新增土壤流失量123643.1t;其中施工建设期48543.8t,新增29126.28t。水土保持措施实施后水土流失防治将达到国家一级防治标准,其中水土流失总治理度95%,扰动土地整治率95%,拦渣率90%,土壤流失控制比0.8,林草覆盖率25%,植被恢复系数97%。本项目水土保持措施主要在路基、挖弃土场、施工便道和生产生活区所采取的护坡、截排水沟、路基拦挡、土地平整、边坡绿化等措施。本项目水土保持总投资6280.16万元,其中,纳入本方案的主体工程已列水保投资4366.10万元,需新增的水土保持投资约1914.06万元,其中工程措施投资557.44元,植物措施211.31元,临时措施90.41元。水土保持措施实施后将有效保护水土流失,改善生态环境,保护公路的安全运行和附近村民的生命财产安全。
[Abstract]:Based on the basic information of the project , it is necessary to take into account the basic situation of the project area , the amount of soil and soil erosion , the monitoring of water and soil conservation , the investment and benefit analysis of soil and water conservation .
The borrow area occupies an area of 8.49hm2 , where the original spoil area is 7 , newly added 5 places , totally 14 places ;
The total amount of spoil is 273.69 million m3 , and the total occupied area is 25.93hm2 . According to the comparison of the scheme , there are 9 soil and soil conservation areas in the area of Weijiatan in the northeast of Xingxian County . The total length of the Project is 238.69hm2 , the area of water and soil conservation facilities is 309.58hm2 , the average soil erosion modulus of the project is 11000t / km2 路 a , the average soil erosion modulus of the highway is 11000t / km2 路 a ; the total amount of soil erosion is 817.24t , and the added soil loss amount is 123643.t ;
The soil and water conservation measures of this project are mainly on the slope protection , intercepting ditch , subgrade retaining , land leveling , slope greening and other measures . The water and soil conservation measures of the Project mainly include slope protection , drainage ditches , subgrade retaining , land leveling , slope greening and other measures adopted in the main works of the Project . The water and soil conservation measures of the Project mainly include water and soil erosion , soil erosion control ratio 0.8 , forest grass coverage rate 25 % and vegetation recovery coefficient 97 % . The water and soil conservation measures of the Project mainly include water and soil erosion , improvement of ecological environment , safe operation of highway and safety of life and property of nearby villagers .
【学位授予单位】:山西农业大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:U412;S157.2
【参考文献】
相关期刊论文 前8条
1 金昕;刘国东;何婧;;改建公路水土保持方案的编制及存在问题[J];亚热带水土保持;2008年02期
2 史彦林;;高速公路建设项目水土流失影响分析评价[J];黑龙江水专学报;2010年01期
3 苏翔;周航;;线型开发建设项目水保方案技术要点及问题探讨——以望东长江公路大桥工程为例[J];科协论坛(下半月);2011年02期
4 唐强;鲍玉海;贺秀斌;文安邦;张信宝;;土壤侵蚀监测新方法和新技术[J];中国水土保持科学;2011年02期
5 付磊;;山区公路建设水土流失防治措施研究[J];水土保持应用技术;2010年01期
6 张诚;公路工程建设中水土流失成因、危害及保持措施[J];山西交通科技;2005年05期
7 冯忠居;门小雄;贾泽祥;;高速公路排水边沟水土流失防治[J];中国水土保持;2006年02期
8 王永功;蔡志洲;于沉鱼;;高速公路水土保持方案编制中的问题与思考[J];中国水土保持;2010年04期
相关硕士学位论文 前2条
1 傅杰;丹庄高速公路水土保持设计中若干问题探讨[D];大连理工大学;2003年
2 郭静;开发建设项目水土保持监测与评价研究[D];山东农业大学;2008年
,本文编号:1783028
本文链接:https://www.wllwen.com/kejilunwen/daoluqiaoliang/1783028.html