城市快速路建设工期影响因素识别与对策
发布时间:2018-06-18 12:41
本文选题:城市快速路 + 建设工期 ; 参考:《华侨大学学报(自然科学版)》2017年06期
【摘要】:针对城市快速路建设工期延期的现状和影响因素识别复杂的难题,在梳理城市快速路建设工期基本理论的基础上,构建城市快速路建设工期影响因素的等级全息模型(HHM).以厦门城市快速路建设为实证,通过专家访谈,初步分析城市快速路建设工期的影响原因;进而提出城市快速路建设工期的影响因素清单;采用专家权威度系数模型,对风险清单进一步计算和筛选.最后,从可控和不可控层面提出城市快速路建设工期控制的应对策略.
[Abstract]:In view of the current situation of urban expressway construction period extension and the complicated problem of influencing factors identification, based on combing the basic theory of urban expressway construction period, the hierarchical holographic model of influencing factors for urban expressway construction period is constructed. Taking Xiamen City Expressway Construction as an example, through expert interviews, this paper preliminarily analyzes the reasons for the duration of urban expressway construction, then puts forward the list of factors that affect the construction period of Urban Expressway, and adopts the expert authority coefficient model. Further calculation and screening of risk lists. Finally, from controllable and uncontrollable level, the countermeasures of urban expressway construction period control are put forward.
【作者单位】: 华侨大学土木工程学院;厦门工学院土木工程系;厦门市建设局;
【基金】:福建省厦门市建设局科技计划项目(XJK2015-2-4)
【分类号】:U415.13
【相似文献】
相关期刊论文 前10条
1 马韵;;淮安市城市快速路规划因素研究[J];中国市政工程;2013年03期
2 郭继孚,全永q,
本文编号:2035517
本文链接:https://www.wllwen.com/kejilunwen/daoluqiaoliang/2035517.html