断层破碎带地段隧道稳定性分析与施工参数优化研究
[Abstract]:During the construction of long tunnel through fault broken zone, it is easy to appear the problems of deformation, collapse and other disasters, which seriously affect the safety and progress of construction and endanger the safety of personnel. At present, the construction technology of safe and fast crossing fault fracture zone is not mature. Therefore, it is of great practical significance to carry out systematic research on the safety and rapid construction of tunnel crossing fault fracture zone. In this paper, a new railway tunnel is used as the engineering background. Firstly, the stability analysis of surrounding rock, the theory and method of tunnel support are summarized. Secondly, the deformation, stress and safety of surrounding rock and supporting structure of tunnel passing through different dip fault broken zone are studied, and the construction parameters of this project are optimized and analyzed again. Finally, the field monitoring data of tunnel crossing fault fracture zone are analyzed. The main contents and results of this paper are as follows: (1) the influence of fault fracture zone inclination on tunnel stability combined with geological structure of supporting engineering, through three-dimensional numerical simulation, This paper first analyzes and summarizes the variation law of tunnel structure deformation and force when the tunnel passes through different dip angle (such as 75 掳or 90 掳~ 105 掳) fault broken zone, then discusses the feasibility of tunnel excavation and does not do initial support, and analyzes and summarizes the necessity of advanced reinforcement. Finally, numerical analysis is carried out on the advance reinforcement of the tunnel through the fault broken zone, and the safety of the tunnel structure is evaluated. The effectiveness of advanced reinforcement is verified. (2) Optimization of construction parameters of tunnel through fault broken zone combined with concrete construction method and support design of a newly built railway tunnel, through three-dimensional numerical simulation, This paper optimizes the depth of tunnel excavation and reinforcement zone, compares and analyzes the deformation, force and safety of tunnel structure, summarizes the influence of different construction parameters on tunnel, and finally determines the reasonable construction parameters. In order to ensure the safe and rapid construction of tunnel engineering. (3) the analysis of tunnel deformation and force monitoring data combined with the field monitoring data of typical section of the tunnel, firstly, the contribution of the upper and lower step excavation support to the tunnel deformation is analyzed. Then, the effects of initial lining and second lining on deformation and stress of tunnel structure and their respective functions and contributions are compared and analyzed. The load-sharing ratio of initial support is 69.3 and that of secondary lining is 30.7. Finally, the field monitoring data and numerical calculation results are compared and analyzed, which verifies the rationality of numerical simulation method and analysis idea. In order to better guide the design and construction of similar projects. In a word, this paper analyzes the influence of fault fracture zone on tunnel excavation from many aspects, and verifies the rationality of tunnel excavation in fault breakage zone. The research idea of tunnel crossing fault fracture zone is supplemented and perfected, and it also provides a reference for this project and similar projects.
【学位授予单位】:北京交通大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:U455.4
【相似文献】
相关期刊论文 前10条
1 ;用抗滑桩加固露天矿边坡断层破碎带[J];金属矿山;1974年05期
2 汪琦,李忠;公伯峡水电站导流隧道上游断层破碎带地质特征及治理措施研究[J];铁道工程学报;2001年03期
3 刘洪光;;隧道断层破碎带的处理技术[J];水运工程;2006年07期
4 赵存明;沈斐敏;张燕清;吴存兴;;一种探测隧道含水断层破碎带的新技术——瑞利波探测技术[J];公路;2007年09期
5 赵存明;沈斐敏;张燕青;吴存兴;;隧道含水断层破碎带的探测与治理[J];华东公路;2007年04期
6 袁庆利;;某隧道断层破碎带处结构分析与设计[J];铁道标准设计;2008年09期
7 钟德军;;隧道穿越断层破碎带施工技术[J];山西建筑;2008年26期
8 秦镇;;浅谈隧道断层破碎带施工[J];中国新技术新产品;2009年12期
9 杨金虎;;慈母山隧道穿越断层破碎带开挖支护技术分析[J];地下空间与工程学报;2011年02期
10 朱伯芳;关于混凝土坝基础断层破碎带的处理及施工应力问题的商榷[J];水利水电技术;1964年10期
相关会议论文 前10条
1 税明东;成坚;;断层破碎带综合处治措施的研究[A];铁路长大隧道设计施工技术研讨会论文集[C];2004年
2 赵军;唐学军;朱小明;王永刚;王增运;;寒区隧道断层破碎带塌方段支护参数及动态化监测研究[A];第十二次全国岩石力学与工程学术大会会议论文摘要集[C];2012年
3 李建民;章之燕;;采用不同工艺通过不同水文单元断层破碎带的实践[A];第八届全国采矿学术会议论文集[C];2009年
4 朱卫东;;秀宁隧道出口段穿越断层破碎带的安全施工技术[A];中国土木工程学会第十五届年会暨隧道及地下工程分会第十七届年会论文集[C];2012年
5 潘国栋;周书明;赵晋友;;胶州湾隧道过断层破碎带注浆施工风险分析与控制措施[A];运营安全与节能环保的隧道及地下空间建设第2届学术研讨会交流报告[C];2011年
6 周书明;潘国栋;罗小平;;海底隧道过断层破碎带施工风险分析与应对措施[A];第九届海峡两岸隧道与地下工程学术及技术研讨会论文集[C];2010年
7 黄俊;罗永忠;;断层破碎带对宽体公路隧道设计的影响分析[A];第九届全国岩石力学与工程学术大会论文集[C];2006年
8 杨维武;文桂录;田维金;刘增跃;林振球;;八盘岭隧道富水断层破碎带预注浆[A];中国锚固与注浆工程实录选[C];1995年
9 杨重存;;公路隧道断层破碎带信息化施工技术研究[A];科技、工程与经济社会协调发展——中国科协第五届青年学术年会论文集[C];2004年
10 钟世航;孙宏志;李术才;王荣;李树忱;;陆地声纳法探查预报隧道掌子面前方断层、破碎带[A];中国地球物理学会第二十三届年会论文集[C];2007年
相关重要报纸文章 前9条
1 记者 喻文杰 赵成新 通讯员 许波;3万多建设者“邵怀”路上建奇功[N];湖南日报;2006年
2 齐中熙 樊曦 于文静;“天路”即将变“坦途”[N];新农村商报;2014年
3 谷文辉 盘县大山镇旧屋基煤矿;论加固注浆支护在断层附近的应用[N];贵州政协报;2011年
4 本报记者 江耀明;靠隧道牌为信誉加分[N];中国铁道建筑报;2005年
5 刘志广;隧道断层破碎带控制爆破技术[N];中华建筑报;2007年
6 尹登明;二十一局集团三公司宜万项目部 科技降服六冒隧道[N];中国铁道建筑报;2004年
7 通讯员 高仕红;穿越“地质博物馆”[N];中华建筑报;2012年
8 本报首席记者 齐泽萍;一“险”一“奇”看高速[N];山西经济日报;2011年
9 王冰炎;寒暑越四载 安稳穿燕山[N];中国交通报;2014年
相关博士学位论文 前3条
1 俞文生;隧道泥质充填断层破碎带劈裂注浆扩散机理及工程应用[D];长沙理工大学;2015年
2 桂辉;物源组合对煤系断层破碎带渗透性的影响研究[D];中国矿业大学;2017年
3 李林;隧道穿越断裂带地震响应特性及抗震措施研究[D];西南交通大学;2014年
相关硕士学位论文 前10条
1 王晓;断层破碎带地段隧道稳定性分析与施工参数优化研究[D];北京交通大学;2017年
2 杨晓东;强风化混合花岗岩断层破碎带隧道涌水处治措施研究[D];长安大学;2015年
3 陈星宇;断层破碎带隧道涌水特征试验研究[D];长安大学;2015年
4 郝亭宇;地下工程典型不良地质水害治理技术[D];山东大学;2015年
5 李鑫;雩山隧道断层破碎带稳定性分析及治理方法[D];山东大学;2015年
6 黄劲;公路隧道富水断层破碎带施工风险评估[D];长安大学;2016年
7 常乔磊;隧道穿越断层破碎带围岩变形规律研究[D];西南交通大学;2017年
8 杨拯;断层破碎带影响下山岭隧道施工力学行为研究[D];西南交通大学;2012年
9 张毅;梅大高速公路断层破碎带隧道施工风险评估[D];长安大学;2012年
10 薛佃立;隧道穿越断层破碎带震害机理分析[D];重庆交通大学;2013年
,本文编号:2214078
本文链接:https://www.wllwen.com/kejilunwen/daoluqiaoliang/2214078.html