城市周边高速公路改扩建若干主要问题研究
[Abstract]:With the rapid development of social economy, the division of labor in urban space is becoming more and more refined, and the relationship between different regions is becoming closer and closer. Part of the existing expressway capacity and some of the technical standards have been unable to meet and adapt to modern traffic needs, traffic capacity and traffic demand has become increasingly inadaptable. This contradiction is especially prominent in the expressway around the city. With the rapid development of urbanization and the continuous expansion of urban population, the scale of the main urban area is constantly expanding, and the early stage of the construction of the expressway surrounding the countryside or the suburbs is gradually changing into the urban area, and the public expectations for the function of the expressway are also increasing. Not only hope highway to provide express transportation service, but also to provide support for land development along both sides of the route. Therefore, how to better solve the problems of various functional requirements and imperfect technical specifications encountered in the reconstruction and extension of the expressway around the city is the main challenge faced by highway builders. Based on the design of Shenhai High-speed Shenzhen Airport to He-ao Expressway (Machine load High-speed) reconstruction and extension project, starting with design control analysis, this paper comprehensively analyzes the control factors that restrict the construction of the project. According to the strict degree of the restriction of engineering construction, the paper puts forward the solution of various control conditions, analyzes the functional requirements of high speed machine load, clarifies the function orientation, and on this basis, analyzes the characteristics of the project. The main technical standard of the project is determined. Finally, the advantages and disadvantages and applicability of various reconstruction and extension methods are analyzed, and the scheme and implementation points of in-situ widening and reconstruction are put forward.
【学位授予单位】:长安大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:U418.8
【参考文献】
相关期刊论文 前10条
1 何玉宝;谢斌;李焱;;高速公路桥梁改扩建的设计研究[J];山西建筑;2011年32期
2 边秀丽;;旧水泥砼路面回收再利用的可行性分析[J];交通世界(建养.机械);2011年05期
3 马炅;;高速公路加宽方案研究[J];交通标准化;2010年13期
4 高艳玲;黄子航;杨培培;;我国高速公路改扩建的必要性分析[J];交通标准化;2009年22期
5 杜战军;;重丘区高速公路改扩建方案比选研究[J];中外公路;2008年05期
6 梁兴胜;;高速公路改扩建经验探讨[J];山西建筑;2008年27期
7 王世杰;;安新高速公路改扩建工程总体方案研究与关键工程技术设计[J];交通标准化;2008年05期
8 王勇;雷红尧;高波;;综合运输网络中的公路交通量分析与预测探讨[J];公路;2008年03期
9 时义鹄;;我国高速公路发展与改扩建拓宽工程综述[J];湖南交通科技;2007年04期
10 李慧;林荣娜;;弹性系数法在公路工可交通量预测中的应用[J];西华大学学报(自然科学版);2006年05期
相关博士学位论文 前2条
1 廖朝华;高速公路改扩建工程关键技术研究[D];武汉理工大学;2009年
2 王晖;高等级公路项目可研阶段交通量预测若干问题研究[D];长安大学;2003年
相关硕士学位论文 前5条
1 曹新玲;高速公路加宽改扩建关键技术研究[D];华南理工大学;2012年
2 王楠;高速公路改扩建工程路线的设计研究[D];长安大学;2011年
3 罗波;高速公路加宽改建路基路面工程关键技术的研究[D];长安大学;2010年
4 夏阳;改扩建高速公路交通量预测方法研究[D];武汉理工大学;2006年
5 戈向群;老路改建工程线形的设计与研究[D];东南大学;2004年
,本文编号:2253319
本文链接:https://www.wllwen.com/kejilunwen/daoluqiaoliang/2253319.html