道路工程投标策略研究
[Abstract]:Since entering the new century, with the development of our national economy, the process of urban modernization has been accelerated gradually, and the bidding work of road construction has made steady, orderly and deep progress. Bidding means that the tenderer or person, on the basis of agreeing to the tender documents drawn up by the owner's unit, makes a serious study and discussion on the tender documents, Submit to the tenderer within a certain time limit the competitive price and technical documents required for the completion of the project, thus allowing the employer to select the transaction process. The bidding price refers to the price of the single project, the price of the partial project and the overall price of the project, determined on the basis of careful study of the project cost and bidding documents, and the analysis of various factors that may affect the project cost. And to formulate bidding strategy, determine the final bid price. This paper aims at the phenomenon of blind participation of construction enterprises in bidding for road engineering in China. According to the existing theoretical research and data documents, using the mathematical methods of probability and statistics, this paper scientifically selects suitable bidding items for construction enterprises. Thus, the winning rate of construction enterprises is improved. In order to make the enterprise obtain more actual income, the technique of unbalanced quotation is used to redistribute the single quotation, to compare the benefit of the project quantity change with the case, and to make further analysis on the result. In order to improve the turnover rate of enterprise funds, using the technique of unbalanced quotation, the single quotation is redistributed, and according to the balance of unit price of different material and item project before and after construction progress, the scheme is compared. The results are further analyzed. In the application of bidding strategy, the importance of risk management should be taken into account at the same time. Through the analysis and response of various risks, combined with the project selection method and unbalanced quotation skills, the bidding scheme and quotation should be determined. Finally, through the road project bidding case to demonstrate.
【学位授予单位】:沈阳建筑大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:U415.13
【参考文献】
相关期刊论文 前6条
1 杨蓉;;试论道路工程的投标报价策略[J];科技创新与应用;2014年06期
2 VAN DE VEN M F C;MOLENAAR A A A;;Environmental Concern of Using Coal Tar in Road Engineering and Its Possible Alternatives[J];武汉理工大学学报;2010年17期
3 黄坤;;投标策略浅析[J];科学之友(B版);2009年03期
4 ;Development of highway constructing technology in the permafrost region on the Qinghai-Tibet plateau[J];Science in China(Series E:Technological Sciences);2009年02期
5 李想堂;张肖宁;王端宜;;Measurement of a thin layer's thickness using independent component analysis of ground penetrating radar data[J];Journal of Harbin Institute of Technology;2008年04期
6 齐炳艳,石桥;公路工程投标报价编制与策略[J];中外公路;2001年05期
相关博士学位论文 前2条
1 郭清娥;不完全信息下工程项目投标决策方法研究[D];天津大学;2012年
2 於永和;BOT项目投标决策模型及其应用研究[D];湖南大学;2006年
相关硕士学位论文 前10条
1 刘劲飞;建设项目投标风险分析及其应对[D];西南交通大学;2013年
2 岳晓宏;公路工程投标报价问题研究[D];中国地质大学(北京);2012年
3 廖辉辉;施工企业投标策略及报价技巧探讨[D];华南理工大学;2012年
4 陈苹苹;基于合理低价中标的施工承包商投标决策研究[D];西南石油大学;2012年
5 陈宜;公路工程项目投标报价前评估研究[D];天津大学;2012年
6 陈晨;建设工程招投标管理风险识别的理论研究[D];浙江工业大学;2013年
7 孔政;基于博弈论的投标报价策略研究[D];重庆交通大学;2012年
8 苏喜燕;基于工程量清单计价模式的公路工程投标报价策略与技巧研究[D];长安大学;2011年
9 郭聪林;公路工程投标策略及报价技巧研究[D];长安大学;2011年
10 傅晓军;工程项目投标阶段风险管理研究[D];贵州大学;2009年
,本文编号:2308743
本文链接:https://www.wllwen.com/kejilunwen/daoluqiaoliang/2308743.html