500千伏临海变电站扩建工程项目管理研究
发布时间:2018-05-28 05:05
本文选题:变电改造工程 + 项目管理 ; 参考:《东南大学》2016年硕士论文
【摘要】:500千伏临海变电站扩建工程项目是为了满足连云港沿海经济开发区需要而开工建设的大型电力工程项目。该项目的建成将解决连云港地区日趋紧张的供电难题,为当地沿海大开发的招商引资保驾护航。由于在该地区开展大型基建工程项目管理的经验不多,为此,本文针对500千伏临海变电站扩建工程项目管理实际,对项目的质量、成本与进度联合控制等关键问题进行深入研究。论文首先对一般项目的进度管理、成本管理与质量管理的原则、因素以及方法措施等进行分析,对于现有变电站工程管理的研究方法和理论进行了介绍。接着结合500千伏临海变电站扩建工程概况,围绕变电站工程的特点分析项目设计,提出了项目前期管理的思路。而后,对施工进度、成本管理及措施,尤其是在质量管理过程中的采取的相关措施予以具体地分析介绍。最后运用挣值原理,分四个阶段对500千伏临海变电站扩建工程项目进行了进度-成本联合控制,具体分析了实际建设过程中产生偏差的原因,并结合具体情况提出相应的纠偏措施。500千伏临海变电站扩建工程项目已建成并投入运营。本文的部分研究成果在项目的建设过程中得到运用并取得了良好效果。
[Abstract]:The 500 kV Linhai Substation extension Project is a large electric power project which is started to meet the needs of Lianyungang Coastal Economic Development Zone. The completion of the project will solve the increasingly tense power supply problem in Lianyungang area, and protect the local coastal development. Because there is not much experience in carrying out large-scale capital construction project management in this area, this paper aims at the actual project management of the 500kV Linhai substation extension project and the quality of the project. Key issues such as joint cost and schedule control are studied in depth. Firstly, the paper analyzes the general project schedule management, cost management and quality management principles, factors and methods and measures, and introduces the existing research methods and theories of substation project management. Then according to the general situation of the extension project of 500kV Linhai substation, the project design is analyzed around the characteristics of the substation project, and the thinking of the pre-project management is put forward. Then, the construction schedule, cost management and measures, especially in the process of quality management, are analyzed and introduced in detail. Finally, by using the earned value principle, the schedule and cost of the 500kV Linhai substation expansion project are controlled in four stages, and the causes of the deviation in the actual construction process are analyzed in detail. According to the concrete situation, the corresponding rectifying measures. 500 kV Linhai substation extension project has been completed and put into operation. Some of the research results in this paper have been used in the construction of the project and achieved good results.
【学位授予单位】:东南大学
【学位级别】:硕士
【学位授予年份】:2016
【分类号】:TU712;TM63
【参考文献】
相关期刊论文 前6条
1 郭刚;李富强;;电力检修现场作业风险分析与控制[J];电力安全技术;2011年04期
2 陈海波;薛玉兰;韩天祥;郑淮;;电力工程资产管理的趋势和挑战[J];华东电力;2009年01期
3 严强;;工程项目责任成本管理机制的建立与运行[J];重庆科技学院学报(社会科学版);2008年09期
4 李涛;马薇;黄晓蓓;;基于全寿命周期成本理论的变电设备管理[J];电网技术;2008年11期
5 陈海明;;浅析施工企业成本控制[J];冶金财会;2006年09期
6 任永恒;变电站技改及大修工程项目的安全管理[J];电力安全技术;2005年07期
,本文编号:1945389
本文链接:https://www.wllwen.com/guanlilunwen/chengbenguanlilunwen/1945389.html