当前位置:主页 > 管理论文 > 绩效管理论文 >

中国高铁基础设施PPP项目模糊综合绩效评价研究——以京沪高铁项目为例

发布时间:2018-03-22 21:21

  本文选题:高铁基础设施 切入点:PPP 出处:《理论月刊》2017年12期  论文类型:期刊论文


【摘要】:近年来,我国开始尝试在高铁基础设施领域运用PPP模式这一新型铁路投融资模式。本文运用模糊综合评价法构建起我国高速铁路的模糊综合绩效评价模型,并以京沪高速铁路项目为例,对模糊综合绩效评价模型进行实例测算。模糊综合评价结果显示,京沪高铁PPP项目在项目工程质量水平、项目时间管理水平、项目效益水平上都达到了"优"等,在项目成本水平上则达到了"良"等,但是,在公私方资本利用水平这一指标上仅为"差"等。
[Abstract]:In recent years, China has begun to try to use PPP mode, a new mode of railway investment and financing, in the field of high-speed railway infrastructure. In this paper, the fuzzy comprehensive performance evaluation model of high-speed railway in China is constructed by using fuzzy comprehensive evaluation method. Taking the Beijing-Shanghai high-speed railway project as an example, the fuzzy comprehensive performance evaluation model is calculated. The fuzzy comprehensive evaluation results show that the Beijing-Shanghai high-speed railway PPP project is in the level of project quality and project time management. The benefit level of the project has reached the "excellent" level, and the project cost level has reached "good" level, but in the level of public and private capital utilization, the index is only "bad" and so on.
【作者单位】: 黄冈师范学院商学院;
【分类号】:F283;F532.8

【相似文献】

相关期刊论文 前2条

1 兰英;李虹;韩广智;;PPP中的PFI融资分析——以高速铁路为例[J];管理现代化;2008年01期

2 陈铭;;法国图尔—波尔多高速铁路采用PPP特许经营[J];国外铁道车辆;2011年04期

相关博士学位论文 前1条

1 施张兵;中国高铁外交研究[D];上海外国语大学;2017年

相关硕士学位论文 前4条

1 丁洁琼;基于PPP视角的关中城际铁路网建管体系研究[D];长安大学;2016年

2 林春光;我国高铁PPP项目风险管理研究[D];北京交通大学;2017年

3 魏泽佳;轨道交通PPP项目公司风险评估研究[D];北京交通大学;2013年

4 斯芹;通沈高铁对通辽地区的社会发展影响研究[D];天津大学;2016年



本文编号:1650455

资料下载
论文发表

本文链接:https://www.wllwen.com/guanlilunwen/jixiaoguanli/1650455.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户d061d***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com