GD风力发电项目后评价研究
发布时间:2018-05-24 05:47
本文选题:项目建设 + 项目后评价 ; 参考:《吉林大学》2013年硕士论文
【摘要】:项目后评价属于项目管理内容,是项目建设的最后程序,是对已完成项目的目的、实施过程、运营、效益和影响的客观评价与分析,有利于未来项目建设。由于能源短缺、环境污染等问题,风能作为一种可再生的清洁能源而受到重视,风力发电成为各国政府的热门投资项目。 GD风力发电项目2005年开工建设,次年并网发电,改写了J省作为经济、风资源大省无风电的历史,该项目采用67台单机容量1500kW、轮毂高度80m的风电机组,是国家风电特许权项目中第一个建成投产的兆瓦级项目,2008年被中国电力建设企业协会评定为“中国电力优质工程奖”,2009年入选新中国成立60周年“百年经典建设工程”。 本文主要内容为GD风力发电项目的项目后评价,通过对GD项目深入调研,收集项目前期决策、项目实施以及项目运营等方面资料,对项目前期决策工作、实施过程、项目运营、项目效果与效益,以及项目目标和持续性进行了分析和评价,并根据分析与评价结果,总结了项目决策、建设、运营、管理等方面的经验与教训,,提出了对GD项目运营和未来项目建设的建议。GD项目后评价研究对GD项目正常运营和企业今后的风电项目建设均具有一定的指导意义。
[Abstract]:Post-project evaluation is the content of project management and the final procedure of project construction. It is an objective evaluation and analysis of completed project, implementation process, operation, benefit and impact, which is beneficial to future project construction. Due to the shortage of energy and environmental pollution wind energy as a renewable clean energy has been paid attention to. Wind power has become a hot investment project of the governments of various countries. GD wind power project started construction in 2005 and connected to grid the following year, rewriting the history of province J as economy and large wind resource province without wind power. The project adopts 67 wind turbine units with a single machine capacity of 1500 kW and a hub height of 80 m. It is the first megawatt project completed and put into production in the national wind power concession project. In 2008, it was rated as "China Electric Power quality Engineering Award" by the China Electric Power Construction Enterprise Association. In 2009, it was selected for the 60th anniversary of the founding of New China "Classical Construction Project of one hundred years". The main content of this paper is the project post-evaluation of GD wind power generation project, through the in-depth investigation of GD project, collecting the data of project pre-decision, project implementation and project operation, etc. The effect and benefit of the project, as well as the objective and continuity of the project are analyzed and evaluated. According to the results of the analysis and evaluation, the experiences and lessons of project decision-making, construction, operation, management and so on are summarized. This paper puts forward some suggestions for GD project operation and future project construction. The post-evaluation study of GD project has certain guiding significance for the normal operation of GD project and the future wind power project construction of enterprise.
【学位授予单位】:吉林大学
【学位级别】:硕士
【学位授予年份】:2013
【分类号】:TM614;F426.61
【参考文献】
相关期刊论文 前1条
1 白永前,叶萍,梁学东;电力建设项目后评价实践[J];山西电力;2005年04期
本文编号:1927911
本文链接:https://www.wllwen.com/guanlilunwen/shengchanguanlilunwen/1927911.html