W电厂空气预热器改造项目进度管理研究
[Abstract]:As an important part of enterprise management, project schedule management has gradually become the key determinant for electric power enterprises to gain competitive advantage. How to carry out the project schedule management is closely related to improving the production efficiency and enhancing the core competitiveness of enterprises. This paper first reviews the development of project schedule management and its related knowledge dissemination and application in China, and analyzes the current situation of project schedule management in China and the technical trends of project schedule management at home and abroad. Then the related concepts of project schedule management are expounded, and some common problems in project schedule management are put forward. The main content of this paper is to introduce the application of project schedule management in the equipment transformation of W power plant, and analyze the advantages and disadvantages existing in the equipment renovation schedule management of W power plant. On the basis of literature research and experience, this paper uses the method of theoretical induction and practical comparison to carry out schedule planning and schedule control management for the air preheater renovation project in W power plant, and carries out an empirical study combined with the practice of equipment transformation. In this paper, the whole project schedule management scheme of air preheater renovation project in W power plant is designed and planned. From project description, project decomposition to schedule matrix, schedule optimization, detailed, scientific and reasonable management of the schedule of the air preheater reconstruction project in W power plant. From the aspects of determining the control target, establishing the control system, drawing up the schedule control measures and drawing up the schedule control countermeasures, the progress control of the retrofit project of the air preheater in W power plant has been carried out. This paper investigates and studies the difficulties and obstacles often encountered in the project, and makes corresponding countermeasures by using the method of project management, and sums up, contrasts, analyses and concludes, from the perspective of schedule management, For the implementation of similar projects to provide a lot of valuable experience. In this paper, the scientific project schedule management method is applied to solve the problems in the actual equipment transformation for specific projects and specific cases. From the start of the project, layout, construction, completion to acceptance, problem finding, solution content is detailed, pertinence is strong, has certain reference to the similar engineering project. This paper puts forward that the application of project schedule management to the retrofit of actual equipment in power plants is of great significance to improving the level of project schedule management and is a beneficial attempt in the practice of project schedule management.
【学位授予单位】:华北电力大学
【学位级别】:硕士
【学位授予年份】:2013
【分类号】:F273.4;F426.61
【参考文献】
相关期刊论文 前10条
1 张蚌京;;电力建设项目后评价工作的若干思考[J];电力标准化与技术经济;2008年03期
2 侯建设;吴辉;;南阳西500kV变电站工程施工质量管理[J];电力建设;2009年09期
3 陈昌振;单沅;陈伟标;;户外型220kV变电站设计方案优化[J];广东输电与变电技术;2006年04期
4 徐宁;;风险管理在电力工程项目管理中的应用实施研究[J];甘肃科技;2009年24期
5 徐清超;;变电站自动化应用IEC 61850标准的分析[J];电力系统保护与控制;2009年23期
6 葛黎敏;韩建平;;电力工程项目风险管理的初步研究[J];今日科苑;2009年21期
7 金雪莲;闫敏;马源良;;项目后评价理论在电力项目中的应用[J];青海电力;2009年02期
8 崔晓明;马力;;软件项目进度控制方法研究[J];计算机工程与设计;2010年12期
9 魏宏鸽;程雪山;马彦斌;朱跃;;燃煤烟气中SO_3的产生与转化及其抑制对策探讨[J];发电与空调;2012年02期
10 赵利;毕向林;鹿吉祥;陈洪军;;并行建设工程项目管理模式研究[J];项目管理技术;2011年01期
相关硕士学位论文 前4条
1 赵志岗;火电厂设备检修项目管理体系优化与应用研究[D];华北电力大学;2011年
2 胡娜;H公司机加车间现场改造项目进度计划与控制研究[D];南京理工大学;2011年
3 刘杰;潍坊市天润路改造项目进度计划与控制研究[D];中国海洋大学;2009年
4 刘国栋;中石化山东分公司加油卡工程项目进度计划管理研究[D];西北大学;2009年
,本文编号:2181488
本文链接:https://www.wllwen.com/guanlilunwen/shengchanguanlilunwen/2181488.html