当前位置:主页 > 管理论文 > 生产管理论文 >

江苏农村电网PMS与ERP系统集成项目规划与实施研究

发布时间:2019-07-03 19:19
【摘要】:电力工业作为国民经济的基础性产业,肩负着建设社会主义新农村的重大历史使命。PMS系统对江苏省农村电网通过纵向贯穿、横向集成实现了生产基础的运行和信息管理的资源共享,为克服同省农村电网与主网间的数据壁垒,把主网业务延伸到各农村供电所,将农村低压电网设备的整体数据导入企业资源管理系统,最终实现及完善对生产和资源的信息化管理。进一步再把ERP系统导入到整个农村低压电网设备数据系统中,通过这两个系统的有机集成,进行农村电网建设的改造,从根本上解决以往信息管理方式中资源分散、条块分割、标准不一的弊端。 本文基于对PMS电力生产管理系统和ERP资源管理系统的背景、发展历程、基础理论介绍,分析了系统在实践应用中存在的问题和不足,并对江苏省农村电网的实例进行需求分析,并说明两系统集成的必要性,重点介绍了江苏省农村电网改总体详细规划方案以及实施方案。最后对本文做了总结,PMS与ERP集成后在江苏省农村电网实施取得了显著效果,但由于新改革费时耗资费力,不是所有的企业都能驾驭和实施的,因此针对两系统集成的不足,提出了一些未来发展趋势和改进的建议。
[Abstract]:As the basic industry of the national economy, the electric power industry shoulders the great historical mission of building a new socialist countryside. Through the vertical penetration of the PMS system to the rural power grid of Jiangsu Province, the horizontal integration realizes the operation of the production foundation and the resource sharing of the information management. In order to overcome the data barriers between the rural power grid and the main network of the same province, the main network business is extended to the rural power supply stations. The whole data of rural low voltage power grid equipment is introduced into enterprise resource management system, and the information management of production and resources is finally realized and improved. Furthermore, the ERP system is introduced into the equipment data system of the whole rural low-voltage power grid. Through the organic integration of the two systems, the rural power grid construction is reformed to fundamentally solve the disadvantages of scattered resources, segmented pieces and different standards in the previous information management methods. Based on the background, development course and basic theory of PMS power production management system and ERP resource management system, this paper analyzes the problems and shortcomings existing in the practical application of the system, analyzes the requirements of the rural power grid in Jiangsu Province, and explains the necessity of the integration of the two systems, with emphasis on the overall detailed planning and implementation scheme of the rural power grid reform in Jiangsu Province. Finally, this paper summarizes that the integration of PMS and ERP has achieved remarkable results in the rural power grid of Jiangsu Province, but because the new reform is time-consuming and laborious, not all enterprises can control and implement it, so in view of the shortcomings of the integration of the two systems, some future development trends and suggestions for improvement are put forward.
【学位授予单位】:南京理工大学
【学位级别】:硕士
【学位授予年份】:2013
【分类号】:TM73;F426.61

【参考文献】

相关期刊论文 前10条

1 唐琳,李云峰;供电企业生产检修全过程管理信息系统[J];电力系统自动化;2001年21期

2 金竹声,周庆捷;供电企业输变电运行和生产管理的综合信息系统[J];电网技术;2000年05期

3 俞庆;;对电力ERP软件项目过程的思考[J];电力信息化;2005年08期

4 袁慧;;浅谈信息一体化系统[J];电力信息化;2007年02期

5 张永梅;俞雯静;贾辉;;通过PMS与ERP的有效集成实现设备资产的一体化管理[J];电力信息化;2009年07期

6 王安定;;生产管理系统(PMS)深化应用工作体会[J];电力信息化;2009年12期

7 王亚军;曹曼;;电力企业ERP设备模块设计[J];电力信息化;2010年04期

8 马骞宙;赵希超;;国家电网公司生产管理系统设计与应用[J];电力信息化;2011年02期

9 康永;程伟华;唐巍;;基于ERP全口径设备管理在资产全寿命周期中的应用[J];电力信息化;2011年04期

10 刘力;工程管理系统(PMS)在工程建设管理中的应用[J];贵州水力发电;2004年03期

相关博士学位论文 前1条

1 陈拥军;农村电力需求综合评价和基于地理信息系统的电网规划系统研究[D];浙江大学;2008年



本文编号:2509607

资料下载
论文发表

本文链接:https://www.wllwen.com/guanlilunwen/shengchanguanlilunwen/2509607.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户4da9e***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com