论业主方在合同付款中的成本控制
发布时间:2018-03-23 15:08
本文选题:进度款 切入点:结算阶段 出处:《财经界(学术版)》2016年02期
【摘要】:正本文是站在业主方的立场上,结合作者的工作实践,着重论述在合同执行过程中,预付款、进度款、结算后余款和质保金的支付中的成本管理与控制要点。众所周知,对于业主方而言,一个工程项目成本的管理与控制重点在前期规划阶段和设计阶段,而实施阶段乃至结算阶段的管控只能在很局限的范围内发挥作用。然而,对于从事具体造价工作的人员来说,往往在自己职权范围内,可以把控得较好的是实施阶段的管控。而在实施阶段,比较容易把握的是合同签订后,付款的管理。鉴于此,本文
[Abstract]:This paper is based on the position of the owner, combining with the author's work practice, discusses the key points of cost management and control in the process of contract execution, including the payment of advance payment, progress payment, balance after settlement and quality guarantee. For the owner, the management and control of the cost of a project is focused on the early stage of planning and design, while the stage of implementation and even the stage of settlement can only play a role within a very limited scope. For the personnel engaged in specific cost work, often in their own areas of competence, can be better control of the implementation phase of the control. In the implementation phase, it is easier to grasp the contract after the signing of the payment management. In view of this, this article
【作者单位】: 北京北控国际会都房地产开发有限责任公司;
【分类号】:F299.233.42
【相似文献】
相关期刊论文 前4条
1 李明照;尼亚佐夫孤儿中心工程月进度款结算过程经验分析[J];吉林建筑工程学院学报;1999年02期
2 巫泽华;;中国建筑行业债务链形成原因与对策探讨[J];广西城镇建设;2006年06期
3 田野;;新欠形式及成因的法律解析[J];施工企业管理;2006年11期
4 ;[J];;年期
相关重要报纸文章 前4条
1 记者 刘军 特约记者 郭洪福;辽河油建一公司清欠工作成效显著[N];中国石油报;2003年
2 ;东非大草原上奔腾的“角马”[N];石油管道报;2008年
3 上海建领城达律师事务所;新版示范文本的理解应用及常见的签约风险[N];建筑时报;2013年
4 福思特建筑装饰公司副总经理市场部部长 刘文三;一种与国际惯例接轨的酒店建设资金结算模式[N];中国旅游报;2002年
,本文编号:1653989
本文链接:https://www.wllwen.com/guanlilunwen/chengbenguanlilunwen/1653989.html