当前位置:主页 > 经济论文 > 房地产论文 >

改进价值工程在房地产设计阶段造价控制中的应用

发布时间:2018-02-13 10:10

  本文关键词: 房地产 设计阶段 造价控制 价值工程 模糊数学 出处:《武汉科技大学》2013年硕士论文 论文类型:学位论文


【摘要】:近年来,中国的房地产业迅猛发展,已逐步变为国民经济的支柱产业。但是随着房地产市场由卖方市场变成买方市场,日益健全的市场机制对房地产造价控制提出了更高的要求。文献研究发现,在设计阶段进行造价控制十分有效;价值工程作为控制手段,有改进的必要和空间;然而现有改进价值工程在房地产设计阶段造价控制中的应用不够。本文在此基础上提出了改进价值工程应用于房地产设计阶段造价控制的方法,并用案例进行了实证检验。 本文将设计阶段分为方案设计阶段、初步设计阶段和施工图设计阶段,并着重讨论前两个阶段。比较了限额设计、寿命周期费用、价值工程三种造价控制手段,,提出改进的价值工程应用于方案设计阶段造价控制的方法和应用于初步设计阶段造价控制的方法,在方案设计阶段进行优选,在初步设计阶段进行优化。克服了限额设计、寿命周期费用的缺陷,补充了传统价值工程应用上的不足,使设计阶段造价控制更为科学准确。并以富润·沙市花园为案例,详细演示了应用方法,体现了理论与实证的结合。 本研究表明,文内提出的改进价值工程应用于方案设计阶段和初步设计阶段的方法,是控制房地产造价的有效工具,关系到房地产企业的生存与发展,具有非常重要的作用。
[Abstract]:In recent years, China's real estate industry has developed rapidly and has gradually become a pillar industry of the national economy. However, as the real estate market has changed from a seller's market to a buyer's market, The increasingly sound market mechanism puts forward higher requirements for real estate cost control. The literature research found that cost control in the design phase is very effective, value engineering as a means of control, there is a need for improvement and space; However, the existing application of improved value engineering in real estate design stage cost control is not enough. Based on this, this paper puts forward the method of improving value engineering application in real estate design stage cost control, and makes an empirical test with a case study. In this paper, the design stage is divided into three stages: scheme design stage, preliminary design stage and construction drawing design stage, and the first two stages are discussed emphatically. The cost control means of quota design, life cycle cost and value engineering are compared. The method of applying the improved value engineering to the cost control in the project design stage and the method applied to the cost control in the preliminary design stage are put forward. The optimal selection is carried out in the scheme design stage, the optimization is carried out in the initial design stage, and the quota design is overcome. The deficiency of life cycle cost complements the deficiency of traditional value engineering application and makes the cost control in design stage more scientific and accurate. The application method is demonstrated in detail and the combination of theory and practice is demonstrated with the example of Fulun Shashi Garden. The research shows that the method of applying the improved value engineering to the project design stage and the preliminary design stage is an effective tool to control the real estate cost, which is related to the survival and development of the real estate enterprises and plays a very important role.
【学位授予单位】:武汉科技大学
【学位级别】:硕士
【学位授予年份】:2013
【分类号】:TU201.7

【参考文献】

相关期刊论文 前8条

1 张彩江,马庆国;复杂多项目—多费用管理决策的价值模型研究[J];管理工程学报;2004年04期

2 马学军;;论房地产项目设计阶段成本控制[J];国外建材科技;2006年05期

3 朱卫鸿;商业企业顾客满意战略价值工程分析[J];华东经济管理;2001年06期

4 钱向欣;金向丹;;刍议设计阶段的工程造价控制问题[J];今日科苑;2007年14期

5 陈萍;;应用价值工程提高明矾收得率[J];经济师;2009年08期

6 张毅;刘芳;;浅析如何管理企业:基于价值工程的视角——读德鲁克《管理的实践》感言[J];价值工程;2009年09期

7 段劲;;基于AHP和熵的改进价值工程法在边坡防护方案优选中的应用[J];公路与汽运;2010年06期

8 莫土尧;;浅谈价值工程在建筑电气设计中的应用[J];建材发展导向;2010年04期



本文编号:1507912

资料下载
论文发表

本文链接:https://www.wllwen.com/jingjilunwen/fangdichanjingjilunwen/1507912.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户3ce57***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com