浅谈旋挖桩施工工艺在房地产开发中的选择与应用

发布时间:2018-04-10 00:20

  本文选题:旋挖桩 切入点:合同工期 出处:《住宅产业》2016年11期


【摘要】:正前言基础工程在整个项目的开发过程中占有举足轻重的地位,而桩基子分部工程又是基础工程的主要内容。桩基工程有着看不见、摸不着的弊端,存在许多的不确定因素,对项目的质量、工期、造价、安全管理都产生很大影响。因此,一般在施工前建设单位都会详细分析利弊优劣,选择最佳方案。工程概况:项目地处南京主城区,占地面积28000平方米,单体总层数为18层,工程总桩数734根,施工合同工期要求60天。项
[Abstract]:The foundation engineering plays an important role in the development of the whole project, and the pile subdivision project is the main content of the foundation engineering.There are many indeterminate factors in pile foundation engineering, which have great influence on project quality, time limit, cost and safety management.Therefore, generally before construction units will analyze the pros and cons in detail, choose the best scheme.General situation of the project: the project is located in the main urban area of Nanjing, covering an area of 28000 square meters, the total number of single floors is 18, the total number of piles in the project is 734, and the construction contract period requires 60 days.Item
【作者单位】: 江苏爱涛置业有限公司;
【分类号】:TU753.3

【相似文献】

相关期刊论文 前10条

1 赵金祥;;浅析旋挖桩机施工的优缺点[J];西部探矿工程;2010年04期

2 黎永祺;;旋挖桩施工中常见技术问题及对策分析[J];现代装饰(理论);2011年07期

3 张洋;;旋挖桩施工当中常遇的技术问题与解决对策[J];中华建设;2012年04期

4 彭文;旋挖桩机[J];建筑机械;1996年08期

5 王宁川;;旋挖桩施工中的优势与常见技术问题分析及应对方法研究[J];门窗;2014年02期

6 谈妙泉;张录林;黄勇;汪发文;;旋挖桩机和旋挖桩工艺市场发展初探[J];资源环境与工程;2007年05期

7 刘欣良;戴洪军;韦华;;旋挖桩在电力工程中的应用[J];武汉大学学报(工学版);2007年S1期

8 王康妍;;旋挖桩的施工体会[J];广东科技;2009年10期

9 虞祥;;浅析旋挖桩在基础施工中的应用[J];科技创新导报;2009年30期

10 黄永伦;;结合实例浅析旋挖桩施工技术[J];广东科技;2010年10期

相关会议论文 前1条

1 单明;舒昭然;刘忠昌;;恒隆市府广场大直径旋挖桩承载力试验研究[A];第二届全国工程结构抗震加固改造技术交流会论文集[C];2010年

相关硕士学位论文 前1条

1 王招洪;旋挖桩法施工及检测管理方法研究[D];华南理工大学;2013年



本文编号:1728829

资料下载
论文发表

本文链接:https://www.wllwen.com/jingjilunwen/fangdichanjingjilunwen/1728829.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户c8037***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com