佛山祖庙东华里片区岭南天地项目施工阶段风险管理研究
发布时间:2018-12-25 19:12
【摘要】:2005年开始,中国的经济进入了一个新的发展历程。从过去的鼓励房地产开发,到现在的房地产宏观调控的大背景转变的前提下,我们房地产公司应该在这个不利环境下提出新的理念和措施来应对这种不利的大环境。风险管理正是应对这种大环境转变的情况而提出的一种能实际有效应用的管理方法。对工程项目实行风险管理已越来越得到工程业界的认同与重视,如今,对工程项目风险管理的研究已成为我国项目管理理论界的研究热点。 本文采用定性研究和理论联系实践、案例分析等方法,主要完成了以下研究工作。第一章绪论,,介绍研究问题的原因与研究意义,要进行研究的内容和方法以及论文的总体框架。第二章相关理论回顾,对本文研究问题中所涉及的相关理论进行回顾,找到所研究的问题的理论基础。第三至五章是工程项目风险识别和分析、风险防范和风险管理措施,首先从工程施工阶段风险的独特性分析,重点研究工程项目施工过程中的特点以及风险管理的必要性,引出风险识别的基本步骤与方法,分析出施工阶段的风险的特征,可能引发的问题,在此基础上利用风险应对的措施。第六章使用了实际的项目例子,并运用前5章介绍的风险管理理论对佛山祖庙东华里的旧城改造项目进行风险分析,并对分析的结果进行评价
[Abstract]:Since 2005, China's economy has entered a new development process. From encouraging real estate development in the past to changing the background of real estate macro-control, our real estate companies should put forward new ideas and measures to deal with this kind of adverse environment. Risk management is a practical and effective management method to deal with the change of environment. Risk management of engineering projects has been recognized and paid more and more attention by the engineering industry. Nowadays, the research on risk management of engineering projects has become a hot topic in the theoretical circle of project management in our country. In this paper, qualitative research, theory and practice, case analysis and other methods, mainly completed the following research work. The first chapter introduces the reasons and significance of the research, the contents and methods of the research and the general framework of the paper. In the second chapter, the related theories are reviewed, and the theoretical basis of the problem is found. The third to fifth chapters are the project risk identification and analysis, risk prevention and risk management measures. First of all, from the construction stage of the unique risk analysis, the focus on the characteristics of the construction process of the project and the necessity of risk management. This paper introduces the basic steps and methods of risk identification, analyzes the characteristics of the risks in the construction stage and the problems that may be caused, and on this basis makes use of the measures to deal with the risks. The sixth chapter uses the actual project example, and uses the risk management theory introduced in the first five chapters to carry on the risk analysis to the old city reconstruction project of Foshan Zumiao Donghua li, and carries on the appraisal to the analysis result
【学位授予单位】:华南理工大学
【学位级别】:硕士
【学位授予年份】:2013
【分类号】:TU71
[Abstract]:Since 2005, China's economy has entered a new development process. From encouraging real estate development in the past to changing the background of real estate macro-control, our real estate companies should put forward new ideas and measures to deal with this kind of adverse environment. Risk management is a practical and effective management method to deal with the change of environment. Risk management of engineering projects has been recognized and paid more and more attention by the engineering industry. Nowadays, the research on risk management of engineering projects has become a hot topic in the theoretical circle of project management in our country. In this paper, qualitative research, theory and practice, case analysis and other methods, mainly completed the following research work. The first chapter introduces the reasons and significance of the research, the contents and methods of the research and the general framework of the paper. In the second chapter, the related theories are reviewed, and the theoretical basis of the problem is found. The third to fifth chapters are the project risk identification and analysis, risk prevention and risk management measures. First of all, from the construction stage of the unique risk analysis, the focus on the characteristics of the construction process of the project and the necessity of risk management. This paper introduces the basic steps and methods of risk identification, analyzes the characteristics of the risks in the construction stage and the problems that may be caused, and on this basis makes use of the measures to deal with the risks. The sixth chapter uses the actual project example, and uses the risk management theory introduced in the first five chapters to carry on the risk analysis to the old city reconstruction project of Foshan Zumiao Donghua li, and carries on the appraisal to the analysis result
【学位授予单位】:华南理工大学
【学位级别】:硕士
【学位授予年份】:2013
【分类号】:TU71
【参考文献】
相关期刊论文 前10条
1 徐伟娟;;浅析工程索赔管理[J];广东建材;2007年05期
2 陈兆恩;;施工方如何做好现场签证控制工程造价[J];广东建材;2008年02期
3 钟声;;怎样进行建设工程索赔管理[J];广东建材;2008年03期
4 陈胜营,刘祖祥;高速公路改扩建方案思考[J];公路;2001年07期
5 古尚宣;建设项目质量成本核算问题的探讨[J];广西会计;2000年03期
6 王志民;;承包商工程索赔管理[J];水科学与工程技术;2008年04期
7 王岭山;中西方成本核算的主要差异分析[J];经济师;2004年09期
8 杨s
本文编号:2391521
本文链接:https://www.wllwen.com/jingjilunwen/fangdichanjingjilunwen/2391521.html